The Pattaya News
-=-=-=-=-=-=-=-=-
Sri Racha — Sri Racha authorities officially opened the third section of the “Floating Bridge” project aimed at boosting tourism on Koh Loi on Thursday, October 26th. Back in prior years, the Sri Racha Municipality undertook the construction of the floating bridge, which spans an impressive total length of 480.20 meters, divided into three sections,
New Section of Sri Racha Floating Bridge Opens to Boost Koh Loi’s Tourism
-=-=-=-=–=-=-=-=-=-=-=-=-==-=-
The Pattaya News – Real. Unbiased. Impactful. In the moment.