Latest:

UPDATE: Chalong to Patong Road construction is 80 percent completed

The Phuket Express
-=-=-=-=-=-=-=-=-

Chalong, Patong – A backup road from Chalong to Patong under construction is now 80 percent completed. Our previous story: The Phuket Governor Narong Woonciew and the President of the Phuket Provincial Administration Organisation (PPAO) Rewat Areerob on October 24th surveyed the local road behind the Silsuparam Temple in Chalong. Now for the update: Mr.
UPDATE: Chalong to Patong Road construction is 80 percent completed
-=-=-=-=–=-=-=-=-=-=-=-=-==-=-
The Phuket Express – Real. Unbiased. Impactful. In the moment.

Read More

Share this post:

Latest News
TPN National News
The Pattaya News
The Phuket Express
Popular NEWS
Popular National News
Popular Pattaya News
Popular Phuket News
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore